TAFELHOF PALAIS


MODERNER, NACHHALTIGER GEWERBEKOMPLEX

THE PROJECT AND ITS REQUIREMENT

The complex consists of two towers with 10 and 13 floors above ground respectively as well as of two wings with 7 upper floors each, creating a passage-like courtyard situation. The whole complex is connected with a two-storey underground car park with 117 parking spaces. The listed round building along Allersberger Straße is also part of the modern complex. The total
rental area is approx. 49,150 m². The area is situated northeast of the Central Station.
Directly to the south there are 20 tracks of the DB AG.
Trams run east and north. Passing trains close to the building cause structure-borne sound waves which are transferred into the soil and thus into the foundation of the building, too. They may be perceived by the future residents as vibrations or so-called “secondary airborne noise”.

THE SOLUTION

Full-surface, single-layer and double-layer installation of Cibatur underneath the entire base plate and a full-surface single-layer cladding of the entire basement walls with Cibatur. Implementation of the protective measure with tuning frequencies of 8 Hz or 11 Hz.
 

The benefits:

  • Horizontal and vertical support carried out with Cibatur solely
  • Cibatur takes the different sole pressures and earth pressures into account, with virtually constant dynamic properties or natural frequency
  • Simple installation on the construction site, without complicated laying plans
  • Higher comfort despite nearby railway lines

FACTS AND FIGURES

Completion: 2021
City, country: Nuremberg, Germany
Realisation: 2019

CALENBERG PRODUCTS USED

Cibatur