8 / 133


07/04/24

Construction project daycare center, Mering


A two-storey daycare centre for 75 kindergarten children and 48 crèche children at the 7-group facility on Mühlanger in Mering will be built at the beginning of 2024.

This kindergarten centre is located in the immediate vicinity of the 4-track Augsburg - Munich railway line. The railway traffic causes excessive emissions in the form of vibrations and structure-borne sound waves and therefore requires protective measures for the building. The preferred solution here is an elastic bearing. This elastic support is dimensioned as follows: Calenberg Cibatur is supported flat under the floor slab. Calenberg Cisador is used on the basement wall.